Quick reference

TopicRequirementSource
Permit triggerWalls built, moved or altered; change of use; drywall on walls or ceilingsRochester handout
Ceiling height6 ft 4 in for alterations to existing basements, including obstructionsMN amend. 1309.0305 (R305.2.1)
Stair headroom6 ft 4 in for existing basement stairsMN amend. 1309.0305 (R305.2.2)
Escape openingBasement and each sleeping room; sill 44 in max; 5.7 sq ft (5.0 at grade floor)MN amend. 1309.0310 (R310.1)
Smoke alarmsEach sleeping room and outside sleeping areas; interconnected, hardwired, battery backupR314; MN amend. 1309.0314
CO alarmsWithin 10 ft outside each sleeping room (attached garage or fuel-burning appliances)R315
InspectionsRough-ins, framing, insulation, finalsRochester handout
RadonMore than 2 in 5 MN homes at a significant-risk levelMDH

Which code applies?

Minnesota uses a single statewide residential code, administered by the Department of Labor and Industry. Rochester's current basement handout is based on the 2020 Minnesota State Building Code, which adopts and amends the 2018 International Residential Code. DLI has been working on updating the residential rules to a newer edition, so ask which edition applies on the date you apply.

When you need a permit

The handout says a building permit is required when walls are built, moved or altered, when an area's use changes, or when gypsum board is installed on walls or ceilings. Separate permits are needed for electrical, mechanical and ductwork, fireplace, plumbing and gas piping work. Applications go through the city's online public portal.

What your basement plan must show

  • Construction details for new walls, stairs, openings and window wells
  • Size and location of egress windows
  • Plumbing fixture, fireplace and smoke and CO alarm locations
  • Ceiling height, beams and ducts, and stair headroom
  • Room labels such as bedroom, bathroom and family room
  • The scope of foundation insulation, if applicable
  • An electrical plan as described in the city's electrical handout

The city may already have a drawing of your house in its property file; records requests go to the City Clerk.

Ceiling height and stairs

Under Minnesota's amendment, an existing basement being altered needs a finished ceiling of at least 6 feet 4 inches, including beams, girders, ducts and other obstructions, and existing stairs serving the basement need at least 6 feet 4 inches of headroom. That's lower than the national code's standard for new construction, and it's why many Rochester basements can be finished without lowering floors.

Escape openings

Basements and sleeping rooms need at least one emergency escape and rescue opening, with the bottom of the clear opening no more than 44 inches above the finished floor and at least 5.7 square feet of clear area, or 5.0 square feet at grade floor level. A qualifying automatic sprinkler system removes the requirement. DLI's fact sheet on escape openings adds a minimum clear height of 24 inches and width of 20 inches, a window well of at least 9 square feet projecting 36 inches, and a permanent ladder in wells deeper than 44 inches. DLI also notes that altering an existing basement doesn't on its own trigger a new escape opening, but adding a sleeping room does.

Alarms

Smoke alarms are required in each sleeping room and outside each sleeping area, interconnected and hardwired with battery backup; the handout allows battery-only alarms in existing areas in limited cases. Carbon monoxide alarms meeting UL 2034 go within 10 feet outside each sleeping room in existing homes with an attached garage or fuel-fired appliances. Both are verified at the final.

Insulation, framing and fire safety

  • Pressure-treated wood where plates touch concrete or masonry
  • Framing along insulated foundation walls kept out of direct contact with the foundation
  • An interior air and vapor barrier on the warm-in-winter side, with penetrations sealed
  • Foam plastic insulation covered by at least half-inch gypsum board or another approved thermal barrier, unless tested for exposure
  • Enclosed under-stair space protected with at least half-inch gypsum board
  • Cutting and notching of joists, beams and studs checked

Mechanical, plumbing and electrical

Electrical work follows the current National Electrical Code and plumbing follows Minnesota Rules, Chapter 4715. Each habitable room needs a heat supply and a cold air return. A bathroom without an operable window needs an exhaust fan. New gas lines are tested and approved at 25 psi, and fireplaces are installed according to their listing.

Inspections and fees

The sequence is rough-in for electrical, mechanical, fireplace and plumbing; framing after the rough-ins pass; insulation, which may be done with framing; then trade finals and the building final, where alarms are checked. Schedule online through CitizenAccess or by calling 507-328-2600 with the permit number. Fees are based on the value of the improvements, and for owner-performed work the city uses double the materials cost.

Radon

MDH reports that more than two in five Minnesota homes have radon levels posing a significant health risk and that the state's average is more than three times the national level. It recommends testing every home, mitigation at 4 pCi/L or above, and considering mitigation between 2 and 4. County-level results are on MDH's radon data portal.

Contractor licensing

DLI requires a residential building contractor or remodeler license for companies contracting directly with homeowners for work in more than one special skill, such as carpentry, drywall and insulation. Specialty contractors working in only one skill may not need it, and a small-volume exemption exists for very small operators who hold a certificate of exemption. Look up any license on DLI's website before you sign.

Questions to ask a contractor

  • What's your DLI license number?
  • Will you apply for the building and trade permits?
  • How will the insulation and vapor barrier be detailed on my foundation walls?
  • Does the plan show egress, alarms and heat for every bedroom?
  • Should I test for radon before you start?
  • What's warrantied, and for how long?

FAQ

Do I need a permit to finish my basement in Rochester, MN?

Yes, if you build or alter walls, change the use of the space, or install drywall on walls or ceilings. Electrical, plumbing and mechanical work need separate permits.

What is Minnesota's ceiling height rule for existing basements?

A Minnesota amendment allows a minimum finished ceiling of 6 feet 4 inches in an existing basement being altered, including under beams and ducts.

How big does a basement egress window have to be in Minnesota?

At least 5.7 square feet of clear opening, or 5.0 square feet at grade floor level, at least 24 inches high and 20 inches wide, with the sill no more than 44 inches above the floor.